rootbrowseIAC-06B4session 22. Space Stations Assembly and OperationsPapers1. The Integration of ESA’s Long Duration Mission: Astrolab2. Commissioning “Dextre” for On-Orbit Operations3. Enhanced operations efficiency by using the Unified Synoptic System4. Experience on development of control systems of durable orbital stations5. Integrating International Engineering Organizations for Successful ISS Operations6. International participation to the CAPPS (Checkout, Assembly & Payload Processing Services). Alenia Spazio North America (ASNA)7. The International Space Station: Operations & Assembly – Learning From Experiences – Past, Present, & Future8. Free Flyer Capture – New Robotic Challenges from the International Space Station9. International Space Station External Active Thermal Control System lines manufacturing