rootbrowseIAC-10A5session 11. Near Term Strategies for Lunar Surface InfrastructurePapers1. An Approach to Habitation for the Global Point of Departure (GPoD) Lunar Architecture2. A Structured Method for Calculating Habitable Volume for In-Space and Surface Habitats3. Exploration and design of the logistics and hardware for accomplishment of geosciences on the Moon4. Active dust control and mitigation technology for lunar and Martian exploration5. New Technology for Concentrating Micrometer-size Lunar Dust: Process. Applications to Human Toxicity Studies, and Applications to Water Production6. A Power Architecture for the ISECG Reference Architecture for Human Lunar Exploration7. LUNAR IN-SITU RESOURCE UTILIZATION IN THE ISECG HUMAN LUNAR EXPLORATION REFERENCE ARCHITECTURE8. Dust Removal and Best Practices at the Mars Desert Research Station9. Decision-Theoretic System Architecture Model for the Lunar Surface System10. a lightweight lunar rover for working missions11. From Apollo traverses to future EVAs using a mobile laboratory12. ILEWG Roadmap for Lunar Robotic Villages and Human Bases