rootbrowseIAC-21A3session 2B2B. Moon Exploration – Part 2Papers3. Control system design for the ALINA lunar lander4. Rashid Rover: A Small Rover with Big Science Goals8. Next-Generation Mission Operations Software – A demonstration for the Emirates Lunar Mission9. Building a lunar infrastructure with the help of a heterogeneous (semi)autonomous multi-robotic team10. Advancing Utilization of the Moon Through Cryogenic Technologies12. SCALE: A collaborative payload to demonstrate multiple technologies for a lunar habitat and infrastructure13. Gateway Program Status and Overview15. Neutron detector for surface mapping of lunar water17. Solutions for Construction of a Lunar Base – ISU SSP21 Lunar Team Project1001. LUNAR SURFACE MISSION PREPARATION STATUS UPDATE IN KOREA1006. EuroMoonMars Programme and Results 2019-20211007. Summary of Hot Scientific Issues in Lunar Science Research1016. USC Fall 2020 ASTE527 Graduate Space Concept Synthesis Studio - The 2020 ARTEMIS:TWINS Project