• Home
  • Current congress
  • Public Website
  • My papers
  • root
  • browse
  • IAC-10
  • A3
  • 3B
  • paper
  • A detailed design, operation and assessment technology development required for a Mars Sample Return (MSR) Sample Receiving Facility (SRF)

    Paper number

    IAC-10,A3,3B,11,x7845

    Author

    Mr. Mike Guest, Systems Engineering & Assessment Ltd, United Kingdom

    Coauthor

    Dr. Allan Bennett, Health Protection Agency, United Kingdom

    Coauthor

    Dr. Caroline Smith, Natural History Museum, United Kingdom

    Coauthor

    Mr. Robert Baker, Strategic and Technical Consulting, United Kingdom

    Coauthor

    Mr. Colin Grant, Gravatom Engineering Systems Ltd, United Kingdom

    Coauthor

    Dr. James Walker, Health Protection Agency, United Kingdom

    Coauthor

    Dr. Marnie Roberts, Health Protection Agency, United Kingdom

    Coauthor

    Mr. John Vrublevskis, Systems Engineering & Assessment Ltd, United Kingdom

    Year

    2010

    Abstract
    COSPAR Planetary Protection Policy places very stringent requirements on Sample Return missions and ‘breaking the chain of contact’ between Earth and the celestial body from which the sample is returned. This must be continued after return to Earth and –at the same time- any contamination or damage to the sample must be avoided until such time as it can be confirmed as not presenting a biohazard and available for subsequent curation and scientific investigation. Such a facility has never before been built and an investigation has been made to determine the requirements for a Mars Sample Return (MSR) Sample Receiving Facility (SRF) from first principles using a Biohazard Assessment Protocol (BAP) rather than the modification of an existing BSL-4 facility. This approach fully takes in to account cleanliness requirements to avoid sample contamination.
    
    This paper will present the results from the second, and final, part of an ESA funded study starting with detailed requirements and detailed procedures for a MSR SRF derived from the BAP by means of a trade-off and preferred concept. These requirements and procedures were used to create a complete detailed design. The design process revealed areas of uncertainty in the detailed requirements and the risk associated with the major areas of uncertainty were reduced by means of detailed operational analysis and a Failure Mode, Effects, and Criticality Analysis (FMECA) analysis. Finally, from the shortfall between design performance and requirements, key European technologies that needed to be developed were identified and a broad development strategy was formulated taking in to account potential synergies with other applications at all levels.
    
    The results of the MSR SRF study by SEA (as well as the results of another parallel study) will be taken into account by ESA to define the requirements for a follow-on procurement action in the future. There will be a review of the results from both studies and an agreement on the requirements based on these parallel studies. Therefore, the views expressed herein should not be taken to reflect the official opinion of the European Space Agency.
    Abstract document

    IAC-10,A3,3B,11,x7845.brief.pdf

    Manuscript document

    IAC-10,A3,3B,11,x7845.pdf (🔒 authorized access only).

    To get the manuscript, please contact IAF Secretariat.