• Home
  • Current congress
  • Public Website
  • My papers
  • root
  • browse
  • IAC-10
  • A3
  • 6
  • paper
  • GG mission and spacecraft design

    Paper number

    IAC-10.A3.6.6

    Author

    Mr. Alberto Anselmi, Thales Alenia Space Italia, Italy

    Coauthor

    Mr. GIUSEPPE CATASTINI, Thales Alenia Space Italia, Italy

    Coauthor

    Mr. Gianfranco Sechi, Thales Alenia Space Italia, Italy

    Coauthor

    Mr. Antonio Sposito, Agenzia Spaziale Italiana (ASI), Italy

    Coauthor

    Mrs. Elisabetta Tommasi, Agenzia Spaziale Italiana (ASI), Italy

    Coauthor

    Mr. Ferdinando Cassese, DTM Technologies Srl, Italy

    Year

    2010

    Abstract
    GG is a project in Fundamental Physics under consideration as candidate for the next generation of missions of the Italian Space Agency. The mission of GG is to test the Equivalence Principle to 1 part in 10e17, four orders of magnitude better than any ground experiment to date, by a new instrument concept, without cryogenics, designed and optimized for the purpose. A laboratory version of the experiment, GGG, is ongoing since 2003 at the INFN laboratories in Pisa, with ASI funding, providing experimental evidence of all the components that will be needed in space, and constantly improving sensitivity within the limits imposed by the ground environment. Studies on the space mission have been funded by ASI since the late 1990’s. Recently, a new industrial study has been awarded by ASI to Thales Alenia Space–Italy, to bring the design concept up to date with respect to both the GGG lab experience and progress in the enabling technologies such as drag-free control, as successfully demonstrated by ESA’s gravity mission GOCE. The achievements of the study include a high fidelity GG software simulator, developed after the blueprint of the GOCE simulator, and a proven Spin Rate Sensor breadboard. As a result of this new study, the GG project is mature, should this be the decision of ASI, for an immediate start of an Implementation Phase that would bring the satellite to launch readiness in four years.
    Abstract document

    IAC-10.A3.6.6.brief.pdf

    Manuscript document

    IAC-10.A3.6.6.pdf (🔒 authorized access only).

    To get the manuscript, please contact IAF Secretariat.