• Home
  • IAF Digital Library
  • Public Website
  • My papers
  • Home
  • event
  • IAC-26
  • D2
  • 2
  • session 2

    Title

    Launch Services, Missions, Operations, and Facilities

    type

    oral

    Description

    Review of the current and planned launch services and support, including economics of space transportation systems, financing, cost, insurance, licensing. Advancements in ground infrastructure, ground operations, production methods, mission planning and mission control for both expendable and reusable launch services.

    Date

    2026-10-06

    Time

    15:00

    Room

    Hall 23

    IPC members
    • Co-Chair: Mrs. Tina Buechner da Costa, European Space Agency (ESA), France;

    • Co-Chair: Mr. Iwao Igarashi, Mitsubishi Heavy Industries, Ltd., Japan;

    • Rapporteur: Mr. Christian Corba, EUMETSAT, Germany;

    • Rapporteur: Mr. Geovian Stower, Kenya Space Agency (KSA), Kenya;

    • Rapporteur: Dr. Jeremy Pinier, National Aeronautics and Space Administration (NASA), Langley Research Center, United States;

    papers

    Order

    Time

    Paper title

    Mode

    Presentation status

    Speaker

    Affiliation

    Country

    1

    15:00

    CSG ELM multilauncher spaceport topology against launch system CONOPS

    12

    confirmed

    Mrs. Ursula Aniakou

    Centre National d'Etudes Spatiales (CNES)

    France

    2

    15:12

    Construction of the Emergency Rescue Launch Site System for China Space Station Missions

    12

    confirmed

    Prof. Litian Xiao

    Beijing Special Engineering Design and Research Institute (BSEDI)

    China

    3

    15:24

    A Multi-Tiered Framework for Assessing "Left of Launch" Bottlenecks in the 2030–2035 Era

    12

    Mr. Akhil Gujral

    The Aerospace Corporation

    United States

    4

    15:36

    preliminary thermal and mechancal loads estimation for different category launcher stages vertical landing on a sea barge

    12

    confirmed

    Dr. Francesca Maria Pisano

    CIRA Italian Aerospace Research Centre

    Italy

    5

    15:48

    Strategic and Technical Considerations for Developing a Competitive Spaceport in Uruguay

    12

    confirmed

    Dr. Élcio Jeronimo de Oliveira

    Associazione Italiana di Aeronautica e Astronautica (AIDAA)

    Uruguay

    6

    16:00

    From Geography to Safety: assessing Alcântara's potential as a competitive equatorial launch hub

    12

    confirmed

    Prof. Ijar Da Fonseca

    ITA-DCTA

    Brazil

    7

    16:12

    Development and implementation of integrated management for dedicated rideshare launch services

    12

    confirmed

    Mr. Xiangyu Li

    China Great Wall Industry Corporation (CGWIC)

    China

    8

    16:24

    Multi-Criteria Decision Framework and Contractual Risk Assessment for Equatorial Spaceport Site Selection: An AI-Integrated Approach Applied to the Turkish National Space Program

    12

    confirmed

    Mr. Hasan Efekan Bilen

    Istanbul Technical University

    Türkiye

    9

    16:36

    THERMAL ASSESSMENT OF LAUNCH VEHICLE CRYOGENIC TANK OPERATIONS UNDER VARIABLE GROUND CONDITIONS

    12

    Mr. Onur Torun

    ROKETSAN Roket Sanayi ve Ticaret A.S.

    Türkiye

    10

    16:48

    Methodology for decomposing launch capability indicators of China's first liquid oxygen methane reusable launch vehicle (ZQ-3) fleet

    12

    confirmed

    Mr. Tengyue HU

    LandSpace Technology Corporation Ltd.

    China

    11

    17:00

    A Comparison Study of the CFD Solvers for the Jet Noise Computation

    12

    confirmed

    Mr. Tolga Tortum

    ROKETSAN Roket Sanayi ve Ticaret A.S.

    Türkiye

    12

    17:12

    Development of an Actively Stabilized Marine Launch Platform for Small Rocket Launch Operations

    12

    confirmed

    Mr. Álvaro Pérez Mora

    Starlogics

    Costa Rica